Home
Services
Projects
Contact Us


- Central of Combined Cycle of Ghannoush 1 X 400 MW:
  Owner:
 Tunisian Authority for Electricity & Gas
  Consultant: Alstom, Power Centrals
  Contractor: Soccomenin, Tunisia
  Scope:  
  - Flexibility Analysis of 62" line connected to concrete coated burried pipeline and feeding   
    sea water condenser.
  - Checking the appropriateness of 62" expansion joint used.
- Yas Island District Cooling Plant
  (150,000 TR):
  Owner:
Tabreed, Abu Dhabi
  Contractor: Samsung, South Korea
  M&E Consultant: Alllied Consultants
  Scope:
 
- Pipes wall thickness calculation.
  - Computer 3D model of district
    cooling plant.
  - Extraction of piping isometric
    drawings including material list.
  - Piping stress analysis calculation
    and supporting of pipes up to 40"
    connected to chillers, storage
    tanks,cooling towers and pumps,
Enlarge image
PDMS 3D Model for Yas Island District Cooling Plant






                                                    







Enlarge image
PDMS 3D model showing systems in different colors











Yas Island District Cooling Plant-Abu Dhabi
Sectional view showing CHWS system
CHWS system Caesar II plot
- Baltim North Offshore Platform
  Production Separator, Test Sepa-
  rator, Instrument Gas & Manifold
  Skids:
  Owner:
Petrobel, Egypt
  Contractor: ITP, Italy 
  Scope:
  
- Piping stress analysis calculation
    for manifold, production separator,
    test separator and instrument gas
    skids.
  - Pipe supports shop drawings.
Baltim North Offshore Platform Project
  - Skid steel structure stress analysis.
  - Skid steel structure shop drawings.
Manifold skid Caesar II plot

- Construction of Five Hydrocarbon Tanks:
  Owner:
Tankage mediterranee, Algeria
  Contractor: Soccomenin, Tunisia
  Scope:  
  - Piping stress analysis of tank farm piping including buried piping.
  - Pipe supports shop drawings including supports of storage tanks fire fighting rings.

- Global Village Chilled Water Distribution Network:
  Owner:
Empower, Dubai
  Contractor: Allied Consultants, Egypt
  Scope:
  - Stress analysis of 30" buried chilled water suply and return pipeline network

- Dubai Technology and Media Free Zone District Cooling Project (Tecom A, B &C):

  Owner: Empower, Dubai
  Contractor: Allied Consultants, Egypt
  Scope: 
  - Piping stress analysis calculation and supporting of the cooling plant piping up to 
    48" connected to chillers, storage tanks, cooling towers and pumps.
  - Peer Review on Stress Analysis report of buried Chilled Water Distribution Network.